1. XT Edge Protection Barriers at Aveo Bella Vista Retirement Village

    XT Edge Protection Barriers at Aveo Bella Vista Retirement Village

    XT Edge Protection Barriers at Aveo Bella Vista Retirement Village XT EDGE PROTECTIONProject: Aveo Retirement VillageSystem Used: XT Edge ProtectionTime Period: Installed July 2017Customer: Strongbuild CommercialQuantity: 500 XT Edge Panels, 506 PostsInstall Length: 1,200 m OUR SOLUTIONStrongbuild Commercial will deliver a multi-level retirement village located in the Western Sydney suburb of Bella Vista. The structure will span 10 levels and...
  2. A-Frame Barriers an Ideal Solution for CPB in Auckland

    A-Frame Barriers an Ideal Solution for CPB in Auckland

    A-Frame Barriers an Ideal Solution for CPB in Auckland A-Frame Barriers Project: Southern Corridor Improvements Project Details:  System used: A-Frame Barriers Time Period: Installed June 2018 Customer: CPB Contractors Quantity: 174 A-Frame Stands, 173 A-Frame Tubes Install Length: 1,000m Case Study PDF THE PROJECT Auckland’s Southern Corridor Improvements Project includes the stretch of Southern Motorway from Manukau down to Papakura...
  3. Concrete Barriers Improve Safety During Level Crossing Removal

    Concrete Barriers Improve Safety During Level Crossing Removal

    Concrete Barriers Improve Safety During Level Crossing Removal DB80 Concrete BarriersProject: Level Crossing Removal ProjectProject Details: System used: DB80 Concrete Crash BarriersTime Period: Installed April – June 2018Customer: Lendlease (Southern Program Alliance)Quantity: 225 Concrete Barriers – 6mInstall Length: Approx. 1,350m THE PROJECTLend Lease as part of the Southern Program Alliance is currently working on the Level Crossing Removal Project across Victoria...
  4. Deltabloc Precast Concrete Barriers for Gasworks Remediation

    Deltabloc Precast Concrete Barriers for Gasworks Remediation

    Precast Concrete Barriers Cordon Off Rail Corridor DB80 CONCRETE BARRIERS Project: Macdonaldtown Gasworks Remediation Project Details:  System Used: DB80 Deltabloc crash barriers fitted with anti-debris screens Time Period: Installed late 2014 Customer: Thiess Contractors (now Ventia) Install Length: 312m Barrier Length: 6m Download Case Study PDF THE PROJECT After decades of use as a gasworks operation, the soil and groundwater...
  5. Edge Protection Fencing for Melbourne Metro

    Edge Protection Fencing for Melbourne Metro

    Edge Protection Fencing for Melbourne Metro XT EDGE PROTECTION FENCING Project: Metro Tunnel Project Details: System used: XT Edge Protection Time Period: Installed May 2018 Customer: John Holland Quantity: 48 Edge Protection Panels, 100 Steel Star Posts Install Length: 115m THE PROJECT Melbourne’s massive Metro Tunnel project is made up of twin 9km rail tunnels, news stations and high capacity...
  6. Low Deflection Concrete Barriers

    Low Deflection Concrete Barriers

    Low Deflection Concrete Barriers The Fortress Fencing DB80 Deltabloc MASH Approved concrete barrier offers low deflection for maximum safety. It is currently one of the few barriers on the market to already be tested and approved to Austroads’ new 2019 MASH standards. How do concrete barriers deflect impact? Concrete jersey barriers are frequently used across Australia’s roads to prevent vehicles...
  7. DB80 Deltabloc Barriers for West Gate Tunnel

    DB80 Deltabloc Barriers for West Gate Tunnel

    DB80 Concrete Barriers for West Gate Tunnel DB80 DELTABLOC BARRIERS Project: West Gate TunnelProject Details: System used: DB80 Concrete Crash BarriersTime Period: Installed July 2018Customer: CPBJH Joint VentureQuantity: 232 Concrete Barriers – 6mInstall Length: Approx. 1,392m Download Case Study PDF THE PROJECTVictoria’s extensive West Gate Tunnel Project will deliver a vital alternative to the congested West Gate Bridge. It will provide...
  8. Trafix 2000 Water Filled Barriers, Parramatta NSW

    Trafix 2000 Water Filled Barriers, Parramatta NSW

    Trafix 2000 Barriers at Arthur Phillip High & Parramatta Public Schools Upgrade TRAFIX 2000 BARRIERS Project: Parramatta Schools Upgrade System Used: Trafix 2000 Waterfilled BarriersTime Period: Installed July 2018Customer: WatpacQuantity: 45 Trafix 2000 Waterfilled BarriersInstall Length: 90 metres Case Study PDF The Project: Watpac is currently constructing two new schools – Arthur Phillip High and Parramatta Public. The project, valued at $187...
  9. Crowd Control Barriers, Penrith NSW

    Crowd Control Barriers, Penrith NSW

    Barriers make life safer for residents during upgrades to The Northern Road CROWD CONTROL BARRIERSProject: The Northern Road Upgrade Stage 3, PenrithSystem used: Crowd Control BarriersTime period: Installed November 2018Customer: Lend LeaseQuantity: 718 barriersInstall length: 1,650 metres Case Study PDF Project Overview: Lend Lease has been contracted to deliver The Northern Road upgrade in Sydney’s West, substantially improving this heavily...
  10. XT Edge Protection, Castle Hill NSW

    XT Edge Protection, Castle Hill NSW

    Excavation Protection with XT Edge Barrier System​ XT EDGE PROTECTION FENCINGProject: Skyview Apartments DevelopmentProject Details:System Used: XT Edge ProtectionTime Period: Installed July 2018Customer: ToplaceQuantity: 70 XT Edge Protection Panels, 76 XT Edge Protection PostsInstall Length: 168m Download Case Study PDF About the Project: The Skyview Apartments are set to be a collection of luxurious one, two and three bedroom apartments that...