1. Concrete Barriers - GPO Exchange Building - Case Study

    Concrete Barriers - GPO Exchange Building - Case Study

    Concrete Barriers Surround Adelaide's GPO Exchange Building DB80 CONCRETE BARRIERSGPO Exchange BuildingProject OverviewProduct: DB80 Concrete BarriersQuantity: 16 Concrete Barriers (6m), 1 Transition Barrier (6m, for Absorb350)Install Length: 102mTime Period: October 2017Location: Franklin Street & King William Street, Adelaide SA Download Case Study PDF About the Project: Located in the heart of the City of Adelaide will be the new GPO...

1 Item

© Copyright 2017. fortressfencing.com.au All rights reserved. Disclaimer