Rooty Hill Water Filled Barriers

TRAFIX 2000 WATER FILLED BARRIERS

ROOTY HILL CASE STUDY

Rooty Hill RSL Club Carpark – Barrier installation date – July 2018

Project Overview

  • Product: Trafix 2000 Waterfilled Barriers
  • Quantity: 15 Trafix 2000 Waterfilled Barriers
  • Install Length: 30m
  • Time Period: Installed July 2018
  • The Requirements:

    Having begun construction on the new multi-level car park at the Rooty Hill RSL Club. Next Living required a delineation barrier to assist in traffic control and safety. onsite. The carpark at Rooty Hill will cover approximately 3000 square meters. This new carpark will feature will add an extra 570 car spaces to the facility. The additional parking spaces will support growth in Western Sydney’s, Rooty Hill RSL. Catering for the Performing Arts Centre, currently under construction at the RSL site.

    The Solution

    Supplied to Next Living was 30m of Trafix 2000 water filled barriers. Creating a safe exclusion zone, separating vehicle and foot traffic around the carpark. Design and manufactured in Australian. Recommended by many in the industry, the Trafix 2000 is a visible & durable barrier system.

    Product Specifications

  • Length: 2100 mm
  • Height: 900 mm
  • Width: 500 mm
  • Weight: 20 kgs (EMPTY) 200kgs (FULL)
  • Material Strength Tested to AS/NZS 4766:2006
  • UV20 Protection to ASTM D2565
  • SITE PHOTOS